EDT:0.7.0 Planning
- 0.7.0 Availability (December 2)
- Release Candidate 1 (date to be determined, M3 would be first RC)
- System Verification Test (SVT) (9/19- 11/30)
- SVT Plan doc
- Green Threads - SVT Entrance criteria
- Milestone 3 (10/25/2011)
- Driver Stabilization (10/3-10/21)
- EDT:0.7.0 Planning:Iteration 15 (9/19-9/30)
- EDT:0.7.0 Planning:Iteration 14 (9/5-9/16)
- EDT:0.7.0 Planning:Iteration 13 (8/22-9/2)
- EDT:0.7.0 Planning:Iteration 12 (8/8-8/19)
- Milestone 2 (8/5/2011)
- EDT:0.7.0 Planning:Iteration 11 (7/25-8/5)
- EDT:0.7.0 Planning:Iteration 10 (7/11-7/22)
- EDT:0.7.0 Planning:Iteration 9 (6/20-7/8)
- EDT:0.7.0 Planning:Iteration 8 (5/31-6/17)
- Milestone 1 (5/27/2011)
- EDT:0.7.0 Planning:Iteration 7 (5/16-5/27)
- EDT:0.7.0 Planning:Iteration 6 (5/2-5/13)
- EDT:0.7.0 Planning:Iteration 5 (4/18-4/29)
- EDT:0.7.0 Planning:Iteration 4 (4/4-4/15)