COSMOS 1.1 Iteration4 Features

COSMOS v1.1 iteration 4 plan

Schedule for Iteration 4

Schedule for Iteration 4

Design doc every enhancement

  • if the enhancement is really small, put in at least a paragraph and a link to the use case for QA and documentation.
  • if the enhancement is not small, the design doc needs to explain the change, anyone other than the assignee who is affected, how much work it is, any ramifications, and in general please avoid any changes to 3rd party materials other than removing a dependency on it. We have no guarantee that the change will be approved for COSMOS v1.1.

Bugzillas for this iteration (Jimmy, David, Jason, Saurabh, QA, Doc)

Sizing legend:

  • Low - takes 1-3 days
  • Medium - takes a week
  • High - takes more than a week

Status to be filled in by:

  • Data Collection bugzilla status (Jimmy Mohsin)
  • Data Visualization bugzilla status (Jimmy Mohsin)
  • Resource Modeling bugzilla status (David Whiteman)
  • Management Enablement bugzilla status (Jason Losh)
  • RE/Build bugzilla status (Saurabh Dravid)
  • QA bugzilla status (No owner)
  • Doc bugzilla status (No owner)
  • Legal & release review prep and status (Jason Losh)

The Status column can have one of these values:

  • COMPLETE
  • On track
  • At risk
  • Not containable
  • Defer (no longer a priority for this iteration)
  • Not started

Designs and use cases are only required for enhancements.

Priority Status Project or subteam Enhancement Severity Description Blocked by (if applicable) Owner Sizing Design Doc Use Case
Medium On track All 259004 Defect Update the IP log and about.html in v1.1 iteration 4 Jason Losh N/A N/A N/A
High All 259105 Normal Prep for the V1.1 release (part 1) Jason Losh N/A N/A N/A
Medium Defer RM 270836 Normal Update RTx name to FRC Mark Johnson Medium N/A [1]
Medium COMPLETE RM 213635 Enhancement SML-IF editor help not available from F1 David Whiteman Medium design [2]
High Defer Management Enablement 260601 Defect Investigate manual test failures for MDR toolkit David Whiteman Medium N/A N/A
High COMPLETE Management Enablement 273063 Enhancement Commit OSGi implementation of SDD runtime Brad Beck High N/A N/A
High Defer Management Enablement 273067 Enhancement Refactor op/installer as OSGi bundle Ed Blackman High N/A N/A
High COMPLETE Management Enablement 273069 Enhancement Implement CLI for interacting w/ SDD runtime Jeff Hamm High design N/A
High Defer Management Enablement 274067 Defect Update targetResourceRef attribute in COSMOS SDD Jason Losh High N/A N/A

Use cases