Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
2007-01-11
WTP Development Status Meeting 2007-01-11
Outline
Attendees
Announcements and Reminders
WTP 1.5.3
WTP 2.0
Working Groups
Other business?
Team Status and Focus
- Attendees
John L, David W, Raghu S, Larry I, Nitin D, Konstantin K, Pieter H, Bob F, Dave G, Chris B, Amy W, Neil H, Larry D, Kathy C, Tim D, Keith C, Carl A, Rob F, Tim W, Chuck B
- Announcements and Reminders
- Announcements:
- Some WTP PMC Transitions
- Jochen Krause is resigning his role as Requirements Lead and PMC member.
- Tim Deboer named Arthur's PMC delegate with full voting authority.
- Tim Wagner is leaving BEA and stepping down as PMC Lead. His transition will be a gradual smooth one. BEA is still committed to WTP and in his stead, Jess Garms will be Tim's delegate for the time being.
- Conferences:
- EclipseCon2007 open for short talk and demo (Jan 15) submissions. BEA is offered two 100 dollar awards to submissions on WTP sent in to EclipseCon.
- EclipseWorld2007, 11/6/2007-11/8/2007 in Reston, VA. The deadline for abstracts is 4/17/2007.
- Reminder:
- When you reject a hot bug request as a hot bug, change the summary to [hotbug_declined].
- When requested, be sure to update the smoke test results status page.
- Nominations are open until January 22 for the Eclipse community awards.
- WTP 1.5.3
- Due: 2007-02-16
- 1/11 - Component leads complete triage scrub of targetted defects.
- 1/26 - WTP PMC review and approval will begin for any changes.
- 2/2 - Release candidates available for testing.
- 2/5-2/9 - Test and Defect Verifications - No more changes after 2/9.
- 2/12 - Zips and update site files ready to start the mirror process.
- 2/16 - Join Callisto Winter Maintenance Release availability.
- 1.5.3 Guidelines for fixes
- We will be declaring a 1.5.3M build this week, so please smoke test and report results using the latest 1.5.3 M build.
- Smoke Test Scenarios
- Please publish your smoke test scenarios by adding a link here.
- Bug lists
- Resolved, Unverified (~325)
- Verified, Not closed (~20)
- 1.5.3 Hot Bug Requests (~0)
- 1.5.3 Hot Bugs (~2)
- Blockers, Criticals (~1)
- Remaining 1.5.3 Targeted Defects (~45)
- WTP 2.0
- Build Status - We will be declaring our first M5 I Build this week, so please smoke test the latest integration build and update the wiki.
- JSF will be checking in a change today.
- Any news on Update Manager issues - David - We should be good to go for M4 updates, and for Europa.
- Component Leads - Other remaining to do for M4 is the new and noteworthy section. Nitin volunteered to create a skeleton new and noteworthy for other teams to add to. He will open a bug, and other teams can attach updates to that bug. Pieter will follow along so that next time he can lead this effort. Nitin, please send a note to wtp-dev with updates. Thanks!
- M5 Proposed Plan - Recall this will be the build used at EclipseCon!
January 2007 - February 2007 Monday Tuesday Wednesday Thursday Friday 08
M5 Planning09
M5 Planning10
M5 Planning11
Status Call
Smoke Test12
Declare I Build15
M5 Development16
M5 Development17
M5 Development18
Status Call
Smoke Test19
Declare I Build22
M5 Development23
M5 Development24
M5 Development25
Status Call
Smoke Test26
Declare I Build29
M5 Development30
M5 Development31
M5 Development01
Status Call
Smoke Test02
Declare I Build05
M5 Development06
M5 Development07
M5 Development08
Status Call
Smoke Test09
Declare I Build
Platform M512
M5 Development
Start component lead change approval13
M5 Development14
M5 Development15
Status Call
Smoke Test16
Declare I Build
EMF M5
Write tests and produce FVT driver19
FVT and Compatibility Tests20
Defect Verifications
Mustfix defects21
Defect Verifications
Mustfix defects22
Defect Verifications
Status Call
Thumbs Up Test23
Declare WTP 2.0 M5
- Remaining Europa Timeline
January 2007 - February 2007 Platform +1 WTP M5 Feb 09 Feb 16 Feb 23 M6 - API Freeze Mar 23 Mar 30 Apr 06 M7 - RC0 May 04 May 11 May 18 RCn... RCX Jun 15 ? ? Europa Jun 29 Jun 29 Jun 29
- Smoke Test Scenarios
- Please publish your smoke test scenarios by adding a link here.
- Compatibility Tests for WTP 1.5 <--> WTP 2.0
- Information on what to test and how to publish your compatibility test plans can be found here.
- Only web services has entered this information, so we will start collecting status from each component next week.
- A JUnit test is fine, but please explain what the JUnit does. These tests only need to be run during milestion test passes.
- Performance and API Tests
- Need to investigate re-enabling these tests for M5. We will publish these results with every weekly declared build.
- Usage Reports
- The Adopter Usage Reports are posted for component owners...
- To ensure no one is using code they should not be using.
- To prioritize which code you plan to make API.
- The Extension Point Usage Reports are also posted. The instructions for adopters on how to contribute can be found here.
- Rob F to follow up for BEA to contribute these reports.
- Stay tuned in M5 for automated test coverage report numbers based on using TPTP's line coverage analysis tools. Also investigating cross referencing the data from the usage reports to detail where test coverage must be improved.
- Bug lists
- Untriaged (~50) Good progress, but still too many.
- Resolved, Unverified (~160)
- Resolved, Remind or Later (~37)
- Verified, Not closed (~23)
- 2.0 Hot Bug Requests (~0)
- 2.0 Hot Bugs (~0)
- Blockers, Criticals (~1)
- Working Groups
- Java EE 5 Update
- There is a wiki page established for people to follow along.
- Chuck - Still in planning state to define enhancements required. The EJB and EAR 5.0 facets are in for this week's I Build. Also went over SAP's model extensibillity proposal and this is an ongoing discussion as the proposal included too much to bite off, like a new modeling framework. Meetings will now be bi-weekly.
- Axis2 - Kathy - The first initial contribution is 168762 which provides bottom up web service creaton using an axis2 runtime. Planning on Axis2 runtime support for M5 and a demo for EclipseCon.
- Website Update - Bob F - First patch submitted which includes top level /webtools/main.php page. There is also a webtools/pheonix/main.php which dynamically generates a index html file into a pheonix look and feel file. See 129098 for more details. All xhtml documents should port quickly, but complicated xml files like people and community pages will take longer. Please take a look so far and provide any comments/feedback.
- Other business?
Teams Status and Focus for Coming Week
- Common Component Team
- Server Component Team
- Initial Tomcat v6 support coming in
- Working on improving "installable servers adapters" support
- Datatools (RDB, 1.5.x only)
- XML/JSP Component Team
- Resuming work on 1.5.3 hot bug
- Fixing minor bugs as the remainder of the team returns from vacation
- Web Services Component Team
- WTP 1.5.3 - Fixing bugs and ongoing triage of bugs into and out of the release (Query). Today's count: 17.
- WTP 2.0 - Ongoing triaging of RFEs for inclusion in the plan.
- M4 - Smoke, function and compatibility test completed.
- Apache Axis2 - The Axis2 integration effort is in progress. See RFE 165664. Bi-weekly meetings continue. Use cases and requirements drafted. Secondary RFEs are open and targetted to M5 or M6. Lahiru Sandakith (WSO2) has developed and attached the first round of new plugins for Axis2. Legal and technical review commencing.
- Eclipse 3.3 - We are interested in contributing Eclipse WTP's Internet Preference Page to the Eclipse platform under RFE [154100 (Platform level proxy settings) https://bugs.eclipse.org/bugs/show_bug.cgi?id=154100].
- Eclipsecon 2007
- Three proposals submitted by the Web services team:
- Web Services tools in IBM Rational Application Developer v7.0 - DECLINED.
- Understanding the Web services development platform - a case study on adding the Apache Axis2 Web services runtime in WTP - DECLINED.
- Introduction to Web Services Tools in WTP - ACCEPTED. We will approach Christopher Judd for interest in collaborating with him on his similar proposal, Consuming and producing web services with Web Tools (WTP).
- We are submitting an Eclipse/Apache Axis2 demo.
- Three proposals submitted by the Web services team:
- Java EE Component Team
- WTP 1.5.3 ~8 bugs left - on target for most patches in next week
- WTP 2.0 (M5) - Continuing to triage, and request feedback on priority of existing enhancement requests
- Ongoing JEE5 Discussions....
- EJB 3.0, EAR 5.0 facets in this weeks integration driver (Servlet 2.5 next week)
- Evaluate and refine initial design and code for functionality that supports attribute-based mapping of Java classpath entries into the virtual component tree.
- Dali JPA
- Held Dali 1.0 planning and design meetings 8th-10th - Dali_1.0_Planning_and_Design_meetings:_Monday_Jan._7th-8th
- Continue work on JPA model and M5 objectives (see link above for M5 plans)
- JSF
- DTP
- ATF
- releng
- Add versions 1.5.1,1.5.2,1.5.3 to the WTP bugzilla version options list when opening new bugs
- Investigating running and publishing the automated test coverage reports
- Investigating running Performance and API tests