WTP 2013-09-26

WTP Development Status Meeting

Remember, any committer can add an agenda item. Typically, short announcements or news items go in the "Announcements" section at the beginning. Longer items or issues requiring discussion should go in the "Other business" section at end.

Announcements And Special Reports

WTP Calendar

(Weekly Google Calendar)


For Kepler/Luna overall dates, see the Simultaneous Release Calendar


Release / Build status

WTP 3.5.1

3.5.1 schedule

September 13 - September 27 is "quiet" to allow in depth testing with no changes
9/27 Official Release

WTP 3.6: Luna


3.6.0 Schedule

09/26 WTP M2 Candidate build
10/4 Official Luna 3.6.0 M2 availability

Luna Schedule(From Eclipse Luna Simultaneous_Release_Plan)

                                                              Elapsed Weeks  
      End Date                      Span from +0         for RC0   for EPP avail
M1  Friday, August 23, 2013           08/09 to 08/23          6         8   (from previous release GA)
M2  Friday, October 04                09/20 to 10/04          6         6   (from M1)
M3  Friday, November 15               11/01 to 11/15          6         6   (from M2)
M4  Friday, December 20               12/13 to 12/20          6         5   (from M3) (shift from 2 week window to 1 week window)
M5  Friday, January 31, 2014          01/24 to 01/31          6         6   (from M4) (plan to "lose" a week for end-of-year  holidays)
M6  Friday, March 14                  03/07 to 03/14          6         6   (from M5) 

EclipseCon! (03/17 to 03/20) 

M7  Friday, May 09                    05/02 to 05/09          8         8   (from M6) (extra week(s) for EclipseCon)
RC1 Friday, May 23                    05/16 to 05/23          2         2   (from M7)
RC2 Friday, May 30                    05/23 to 05/30          1         1   (from RC1)
RC3 Friday, June 06                   05/30 to 06/06          1         1   (from RC2)
RC4 Friday, June 13                   06/06 to 06/13          1         1   (from RC3)

Quiet week, June 16 to June 20
(no builds during "quiet week", assumed all code is done by end of RC4                         

Release Wednesday, June 25, 2014


See "references" [1] for detailed explanation of what these dates mean. See also the Overall Luna Schedule.

Bug and Feature Highlights

Focus on Quality

  • Improve:
  • Triage:
  • Target to a specific release or "future" if planning to fix but not in the next release
  • Adjust severity as appropriate

Release Bug Review

Bugs targeted to 3.5.1
Bugs targeted to 3.6

Blockers, Hot-Bugs, Hot-Features

Blocker and Critical
Hotbugs [2]
Hotfeatures [3]

Project scrum section

  • Each project answers
    • What are working on?
    • What are you planning for next week?

WTP Common Tools

  • Fixed versioning problems for WTP 3.6
  • Next week: TBD

Dali Java Persistence Tools

  • Fixing bugs for Luna M2 and M3 this week
  • Fixing Luna M3 bugs next week

WTP EJB & Java EE Tools

  • Fixed versioning problems for WTP 3.6
  • Next week: TBD

JavaScript Development Tools

- Fixed versioning problem

JavaServer Faces

  • This week: Looking at performance issues in the Web page Editor
  • Next week: Address performance issues in Luna M3

Server Tools

  • Fixed versioning problems for WTP 3.6
  • Next week: TBD

WTP Source Editing

  • Released CBI changes for XSL and XPath (Bug 414714 and Bug 414715)
  • For next week: Tagging for 3.5.1 and patch reviews

Web Services Tools

  • Applied CBI patches and updated version numbers. Fixed versioning problems for WTP 3.6.
  • For next week: Tag files with R3_5_1.

Releng

  • Fixed versioning problems for WTP 3.6, applying CBI patches, updated Eclipse base to 4.4 M2, tagged maps with R3_5_1
  • Next week: Add WTP 3.5.1 to WTP Kepler Repo, add WTP 3.6 M2 to Simultaneous Release

VJET

  • Fixing issues with RegExp
  • Initial Contribution CQ finalized for Eclipse plugin
  • Working on VJET ANVIL/ type libraries CQs

Any others?

Other business - Long term tracking items

References

  1. Our plan dates are on 'Friday' of the week. But, we produce and test the build on Thursday of the week, and ideally declare on Thursday. The dates in the Google Web Tools group calendar are for 'Thursdays' since that's a calendar for committers. We give ourselves the buffer to Friday, as our "public" date, that others can pick up our build, just in case a regression is found on Thursday and we have to respin and retest. [Technically, some might say, we still have till the following Tuesday or Wednesday for some "Simultaneous Release" due dates ... but it's hard to do much in that window, without disrupting everyone ... so we'll not use that buffer, except for the worst emergencies.]
  2. Hotbug Policy
  3. Hotfeature Policy

Also, see

Kepler SR1 Simultaneous Release Schedule
Kepler release retrospective
Standard Format Plans
WTP 3.5.x maintenance release plan
how/when to branch code?
IP Logs selector