Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

WTP 2013-09-19

WTP Development Status Meeting

Remember, any committer can add an agenda item. Typically, short announcements or news items go in the "Announcements" section at the beginning. Longer items or issues requiring discussion should go in the "Other business" section at end.

Announcements And Special Reports

WTP Calendar

(Weekly Google Calendar)


For Kepler/Luna overall dates, see the Simultaneous Release Calendar


Release / Build status

WTP 3.5.1

3.5.1 schedule

September 13 - September 27 is "quiet" to allow in depth testing with no changes
9/27 Official Release


+0
Fri.
+1
Mon.
+2
Tues.
+3
Wed.
EPP
Thur.
Available
Fri.
RC1 (Warmup) 8/16 8/19 8/20 8/21 8/22 8/23
RC2 8/30 9/02 9/03 9/04 9/05 9/06
RC3 9/06 9/09 9/10 9/11 9/12 9/13
RC4 9/13 9/16 9/17 9/18 9/19 9/20
Juno SR1 ("GA") quiet: 9/20 quiet: 9/23 quiet: 9/24 quiet: 9/25 quiet: 9/26 GA: 9/27

WTP 3.6: Luna


3.6.0 Schedule

09/19 Normal Luna 3.6.0 Integration build
...
09/26 WTP M2 Candidate build
10/4 Official Luna 3.6.0 M2 availability

Luna Schedule(From Eclipse Luna Simultaneous_Release_Plan)

                                                              Elapsed Weeks  
      End Date                      Span from +0         for RC0   for EPP avail
M1  Friday, August 23, 2013           08/09 to 08/23          6         8   (from previous release GA)
M2  Friday, October 04                09/20 to 10/04          6         6   (from M1)
M3  Friday, November 15               11/01 to 11/15          6         6   (from M2)
M4  Friday, December 20               12/13 to 12/20          6         5   (from M3) (shift from 2 week window to 1 week window)
M5  Friday, January 31, 2014          01/24 to 01/31          6         6   (from M4) (plan to "lose" a week for end-of-year  holidays)
M6  Friday, March 14                  03/07 to 03/14          6         6   (from M5) 

EclipseCon! (03/17 to 03/20) 

M7  Friday, May 09                    05/02 to 05/09          8         8   (from M6) (extra week(s) for EclipseCon)
RC1 Friday, May 23                    05/16 to 05/23          2         2   (from M7)
RC2 Friday, May 30                    05/23 to 05/30          1         1   (from RC1)
RC3 Friday, June 06                   05/30 to 06/06          1         1   (from RC2)
RC4 Friday, June 13                   06/06 to 06/13          1         1   (from RC3)

Quiet week, June 16 to June 20
(no builds during "quiet week", assumed all code is done by end of RC4                         

Release Wednesday, June 25, 2014


See "references" [1] for detailed explanation of what these dates mean. See also the Overall Luna Schedule.

Bug and Feature Highlights

Focus on Quality

  • Improve:
  • Triage:
  • Target to a specific release or "future" if planning to fix but not in the next release
  • Adjust severity as appropriate

Release Bug Review

Bugs targeted to 3.5.1
Bugs targeted to 3.6

Blockers, Hot-Bugs, Hot-Features

Blocker and Critical
Hotbugs [2]
Hotfeatures [3]

Project scrum section

  • Each project answers
    • What are working on?
    • What are you planning for next week?

WTP Common Tools

  • Fixed versioning issues for the WTP 3.6 build
  • Next week: TBD

Dali Java Persistence Tools

  • Fixing bugs for 3.6 M2
  • Feature complete for M2

WTP EJB & Java EE Tools

  • Last week: Retargeted remaining WTP 3.5.1 targeted bugs
  • This week: Working on fixing versioning issues

JavaScript Development Tools

  • Last week: Re-targeted 3.5.1 defects
  • This week: Tag 3.5.1

JavaServer Faces

  • Last week
    • Applied the CBI patch
    • Fixed version issues
  • Next week
    • Review bugs with patches

Server Tools

  • Fixed versioning issues for the WTP 3.6 build and updated pom.xml files in plugin and features to make consistent with WTP 3.6 and the updated versions
  • Next week: TBD

WTP Source Editing

  • Cleaned up versioning errors
  • CBI changes have been released
  • Upcoming: Bug 415980 needs reviewed

Web Services Tools

This week:

  • Fixed 3.6 versioning errors
  • Released 3.6 fix for bug 417526. Smoke test this.

Next week

  • Check in CBI fixes (Thanh to convert 3.5-based patches to 3.6 - eGit)

Releng

  • Declared WTP 3.5.1 RC4 and added it to the Simultaneous Release
  • Moved the versioning reference for the WTP 3.6 build up to WTP 3.5.1
  • Will open blocking bugs for versioning issues in WTP 3.6 in preparation for our M2 declare

Any others?

Other business - Long term tracking items

References

  1. Our plan dates are on 'Friday' of the week. But, we produce and test the build on Thursday of the week, and ideally declare on Thursday. The dates in the Google Web Tools group calendar are for 'Thursdays' since that's a calendar for committers. We give ourselves the buffer to Friday, as our "public" date, that others can pick up our build, just in case a regression is found on Thursday and we have to respin and retest. [Technically, some might say, we still have till the following Tuesday or Wednesday for some "Simultaneous Release" due dates ... but it's hard to do much in that window, without disrupting everyone ... so we'll not use that buffer, except for the worst emergencies.]
  2. Hotbug Policy
  3. Hotfeature Policy

Also, see

Kepler SR1 Simultaneous Release Schedule
Kepler release retrospective
Standard Format Plans
WTP 3.5.x maintenance release plan
how/when to branch code?
IP Logs selector
See also the WTP Meeting Archive-Reference Page.

Back to the top