Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

WTP 2013-07-18

WTP Development Status Meeting

Remember, any committer can add an agenda item. Typically, short announcements or news items go in the "Announcements" section at the beginning. Longer items or issues requiring discussion should go in the "Other business" section at end.

Announcements And Special Reports

Welcome back!

WTP Calendar

(Weekly Google Calendar)


For Kepler/Luna overall dates, see the Simultaneous Release Calendar


Focus on Quality (Neil)

  • Improve:
  • Triage:
  • Target to a specific release or "future" if planning to fix but not in the next release
  • Adjust severity as appropriate

WTP 3.5: Kepler

  • Congrats!
  • Download stats: ~331,280 Java EE Epp downloads so far...
  • Retrospective next week

WTP 3.6: Luna

  • Builds have started
  • 1st declare next week - 7/25

WTP 3.5.1

  • Aligned with Eclipse Kepler SR1 Schedule
  • Builds started - junits need attention(move to jre7 build machines)
  • No declared builds until 7/25
+0
Fri.
+1
Mon.
+2
Tues.
+3
Wed.
EPP
Thur.
Available
Fri.
RC1 (Warmup) 8/16 8/19 8/20 8/21 8/22 8/23
RC2 8/30 9/02 9/03 9/04 9/05 9/06
RC3 9/06 9/09 9/10 9/11 9/12 9/13
RC4 9/13 9/16 9/17 9/18 9/19 9/20
Juno SR1 ("GA") quiet: 9/20 quiet: 9/23 quiet: 9/24 quiet: 9/25 quiet: 9/26 GA: 9/27

Bug Review

Bugs targeted to 3.5.1
Hotbugs [1]
Blocker and Critical

Other business - Long term tracking items

  • CBI -
    • Thanh has done an excellent job nudging us along, and we all need to be responsive to the requests.
    • latest blocker bug
    • Eclipse Common Build Infrastructure home
    • Very useful Retrospective on platform move
      • "We still have monolithic build. Apparently would take a LOT of work to change that. This surprised some of us."
      • "Surprised that the time to do (a clean) Tycho/Maven build is about the same as for (a clean) PDE Build. (2 to 3 hours for Platform builds, using either technology ... about an hour spent signing in either case). "

References

  1. Hotbug Policy

Also, see

Kepler SR1 Simultaneous Release Schedule
Indigo release retrospective
Standard Format Plans
WTP 3.2.x maintenance release plan
how/when to branch code?
IP Logs selector
See also the WTP Meeting Archive-Reference Page.

Back to the top