(Cisco) Jim Strawn, E. Dillon, J. Worrell, D. Keysell, R. Craddock, S. Jerman
Minutes
Upcoming 0.4 (Alize) release
Release review set for Sept. 17th. IPLog was approved as of Friday.
Eric to work on the slides and circulate to dev list. Due on Wed 10th.
0.4M1 was pushed out to download site.
Release still needs a lot of work in terms of stability/performance following the changes introduced for this cycle.
Tentative release date: Fri Sept, 19th.
Buckminster Integration
Jim/Steve worked on a buckminster integration allowing to use buckminster to materialize dependent Tigerstripe model projects from a repository.
This is now ready to be put under CVS. Jim to take care of that.
This feature is key for handling a large number of inter-dependent projects.
Question is where should this be hosted eventually? Should it be with buckminster itself? Need to check what is currently hosted there.
Performance hit due to Artifact Patterns
Noticed that the uniform use of Artifact Patterns for creation of any artifact in the workbench leads to multiple request to the Art. Mgr. which triggers a very inefficient flow of events. This should be replaced by a single creation. Richard to commit shortly the change.