Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

ORMF Progress report 22 dec 08

< To: ORMF progress reports

Achim

Goals

Achievements

Barbara

Goals

  1. Complete preparation of Wiki pages for the Survey of Requirements Standards
  2. Prepare Wiki Progress Report pages
  3. Publish initial requirements model and begin review process
  4. Investigate CQ awaiting action

Achievements

All of the above was completed.

Bobby

Goals

Achievements

Joel

Goals

  1. Refactor code into OSGi bundles.
  2. Implement a DomainFactoryService to create domain objects.
  3. Implement a PersistenceService that dishes up DAOs for each domain type.
  4. Introduce SAT into all bundles.
  5. Set up Derby as a Service. It needs to start up the embedded database.
  6. Implement an OSGi application to set up and load database.
  7. Introduce Riena into the server remote service bundles.

Achievements

All of the above was completed.

Jojy

Goals

Achievements

Wolfgang

Goals

Achievements

Yahya

Goals

Achievements

Back to the top