Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
DTP project meeting, November 3, 2010
← Back to DTP Meetings, 2010 page
Attendees
- Linda Chan (Actuate)
- Brian "Fitz" Fitzpatrick (Red Hat)
- Brian Payton (IBM)
Minutes
- Brian P. asked the build team to switch the 1.9 build to daily and the 1.8.2 build to weekly. That's been done, except it looks like 1.8.2 is still daily (which is OK)
- Fitz has summarized his survey on his blog
- There are a couple of new appends in the newsgroup. Fitz and Linda will respond. The ODA question is in regard to an Incubator item, which Linda isn't all that familiar with. (The Incubator contributors have disappeared.)