Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

DTP project meeting, July 27, 2011

Back to DTP Meetings, 2011 page


Attendees

  • Linda Chan (Actuate)
  • Brian Payton (IBM)

Minutes

  • The 1.9.1 build based on the Git repository is ready.
  • There is still an open issue for what to do if we need to make a change to an earlier release and build it.
    • The platform has this problem also
    • Suggestion: leave CVS writeable, but remove the HEAD branch content (so people won't make changes to a "1.9.1" stream that is not used)
    • Another suggestion: since CVS history was moved over to Git, it should be theoretically possible to build an old release from Git.
    • Actuate might need to do this (that is, update and build an existing release level)
    • Our current thinking is that we will go with the first suggestion

Back to the top