DTP Project Lead Meeting Minutes: October 5, 2009
← Back to DTP Project Lead Meeting Minutes: 2009, October through December page
Attendees
- Brian "Fitz" Fitzpatrick (Red Hat)
- Linda Chan (Actuate)
- Brian Payton (IBM)
- Hemant Kolwalkar (IBM)
Minutes
- The PMC will work on the Helios project plan during the PMC meeting tomorrow
- Fitz said that Larry Dunnell (IBM) will no longer be involved with the DTP project. This leaves a gap in coverage for the Connectivity project. Brian P. will find out whether anyone else from IBM will be working on Connectivity in Larry's place
- Hemant said he still needs to look into the Modelbase defect that has a target of 1.7.2
- Fitz said that as of the last time he checked, the Sybase was on track for delivering the doc source files to DTP by the end of October