Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

DTP Project Lead Meeting Minutes: October 5, 2009

Back to DTP Project Lead Meeting Minutes: 2009, October through December page

Attendees

  • Brian "Fitz" Fitzpatrick (Red Hat)
  • Linda Chan (Actuate)
  • Brian Payton (IBM)
  • Hemant Kolwalkar (IBM)

Minutes

  • The PMC will work on the Helios project plan during the PMC meeting tomorrow
  • Fitz said that Larry Dunnell (IBM) will no longer be involved with the DTP project. This leaves a gap in coverage for the Connectivity project. Brian P. will find out whether anyone else from IBM will be working on Connectivity in Larry's place
  • Hemant said he still needs to look into the Modelbase defect that has a target of 1.7.2
  • Fitz said that as of the last time he checked, the Sybase was on track for delivering the doc source files to DTP by the end of October

Back to the top