DTP PMC and Project Lead Meeting Minutes: October 30, 2006

Back to DTP PMC and Project Lead Meeting page

Attendees

  • John Graham
  • Linda Chan
  • Sheila Sholars
  • Rob Cernich
  • Der Ping Chou

Absent

  • Brian Payton
  • Hung Hsi

Minutes

  • Description of DTP stats from dtp-pmc mailing list.
  • DTP 1.0 API process discussion. Proposal:
    • DTP project leads drive API definition
    • All DTP 1.0 API are provisional
    • All Java API and extension points used by exemplary tools must be included
    • If there are some API or extension points that can not be ready by 1.0, this must be clearly marked in the JavaDoc to avoid creating confusion in the adopter community
    • Project leads to propose extension point and Java API to PMC by November 15 (Wed.)
    • After 11/15, the ISV help plug-in will be rebuilt to include only those items proposed and will be circulated to the community for review between 11/15 and December 1 (Fri.)
    • Essentially, this will complete the DTP 1.0 API review cycle for the DTP 1.0RC1 build

Action Items

  • PMC: Determine DTP API policy. The base suggestion is to model after the Eclipse platform
  • Project Leads: Finalize discussion on API review plan (see above) by November 3 (Fri.). If no objections requiring modification to the above plan are registered by 5EST on 11/3, the PMC will consider that all project leads have agreed to it and committed to delivery on the dates mentioned in the plan