Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

DTP PMC and Project Lead Meeting Minutes: May 19, 2008

Back to DTP PMC and Project Lead Meeting page

Attendees

  • Brian Fitzpatrick
  • Sheila Sholars
  • Larry Dunnell
  • Brian Payton
  • John Graham
  • Der Ping Chou
  • Emily Kapner
  • Hung Hsi

Regrets

  • Linda Chan

Agenda

  • Beginning testing phase for RC1 with 5/19 1.6 RC1 build candidate on 3.3.2 and 3.4
  • Any bugs set for RC1 that didn't get in before today need to be bumped to RC2 of future

https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=DataTools&product=Data+Tools&component=Apache+Derby+Conn+Profile&component=Connection+Mgt+Framework&component=Connectivity&component=Data+Source+Explorer&component=DataTools&component=DB+Definition+Model&component=DDL+Generation&component=Docs&component=Driver+Mgt+Framework&component=DSE+Data+Actions&component=Enablement&component=Enablement%3AODA&component=Enablement%3ASAP&component=Enablement%3ASybase&component=Incubator&component=JDBC+Conn+Profile&component=ModelBase&component=Open+Data+Access&component=releng&component=SQL+Debug+Framework&component=SQL+Debugger+Framework&component=SQL+Editor+Framework&component=SQL+Execution+Plan&component=SQL+Model&component=SQL+Query+Builder&component=SQL+Query+Model&component=SQL+Query+Parser&component=SQL+Results+View&component=SQLDevTools&component=Table+Data+Editor&target_milestone=1.6RC1&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailtype1=exact&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&negate0=1&field0-0-0=bug_status&type0-0-0=substring&value0-0-0=CLOSED

  • Reiterate milestone schedule (http://wiki.eclipse.org/DTP_Ganymede_Rampdown_Policy). Cycles getting much shorter, so we need to keep a close watch to make sure we keep things under control. RC2 is really the last chance
  • Bundle activation/lazy start bug (BZ228295) - thanks Brian Payton for delivering changes for modelbase, Hung for SQL Dev tools, and John G for enablement
  • Has anyone looked at the SQL tooling documentation from Emily? (BZ229675) She needs feedback!
  • Doshiro status - committer election finished for enablement (and access granted), modelbase election finished (and was successful, so just need to get his access granted - Brian P or Der Ping?), and sqldevtools election restarted (thanks Brian P) - need at least three people to vote for Doshiro to ensure election success (have 2 now, need one more)
  • We were down to only five bugs still set for Ganymede target milestone, but that is at 15 again. Unless these are dispositioned by 5/21, I will set each of them to "future"

https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=DataTools&product=Data+Tools&target_milestone=Ganymede&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_status=RESOLVED&emailtype1=exact&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0=

  • We were down to just 2 last Monday, but we're up to 13 bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible.

https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=DataTools&product=Data+Tools&target_milestone=---&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0=

  • Sub-project status (from team leads)
  • Open discussion

Minutes

Action Items

Back to the top