Attendees

  • Brian Fitzpatrick
  • Emily Kapner
  • Larry Dunnell
  • Linda Chan
  • Hung Hsi
  • John Graham
  • Brian Payton

Regrets

  • Hemant Kolwalkar (vacation)

Agenda

  • M6 Status
    • We were down to 3 bugs assigned to the 1.7 M4, M5, and M6 milestones that either need to be resolved. I closed one and assigned the other two to M7.
    • Still had a number of bugs associated with 1.6.1 and 1.6.2 milestones. I have now set all of them to future or Galileo.
    • SQL Dev refactoring
    • Other issues?
  • No meeting next week due to EclipseCon 2009, but we'll meet on March 30th
  • Status
  • [Weekly Nag] We are at ~6 bugs with no target milestone set that need to be dispositioned (Thanks for keeping this list small!). Please keep at this list daily if at all possible. [Here's the query.]
  • Open discussion