Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
DTP PMC and Project Lead Meeting Minutes: March 16, 2009
← Back to DTP PMC and Project Lead Meeting page
Contents
Attendees
- Brian Fitzpatrick
- Emily Kapner
- Larry Dunnell
- Linda Chan
- Hung Hsi
- John Graham
- Brian Payton
Regrets
- Hemant Kolwalkar (vacation)
Agenda
- M6 Status
- We were down to 3 bugs assigned to the 1.7 M4, M5, and M6 milestones that either need to be resolved. I closed one and assigned the other two to M7.
- Still had a number of bugs associated with 1.6.1 and 1.6.2 milestones. I have now set all of them to future or Galileo.
- SQL Dev refactoring
- Other issues?
- No meeting next week due to EclipseCon 2009, but we'll meet on March 30th
- Status
- [Weekly Nag] We are at ~6 bugs with no target milestone set that need to be dispositioned (Thanks for keeping this list small!). Please keep at this list daily if at all possible. [Here's the query.]
- Open discussion