DTP PMC and Project Lead Meeting Minutes: June 2, 2008
← Back to DTP PMC and Project Lead Meeting page
Contents
Attendees
- Brian Fitzpatrick
- Larry Dunnell
- Emily Kapner
- Sheila Sholars
- Linda Chan
- John Graham
- Hung Hsi
Regrets
- Brian Payton
- Der Ping Chou
Agenda
- Beginning testing phase for RC3 with 6/2 1.6 RC3 build candidate on 3.3.2 and 3.4
- Doshiro status - Hung, please provide CVS/SVN package information to finish the committer process
- Hung, please have Max look into bug 233453 (https://bugs.eclipse.org/bugs/show_bug.cgi?id=233453) - this is a critical fix we should try and squeeze into RC3 or get into RC4
- Working on getting the Connectivity/SQL Dev Tools help in as part of the normal DTP build, should be done by RC4
- We are up to 23 bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible.
- Sub-project status (from team leads)
- Open discussion