Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
DSDP/DD/DSF Phone 11-December-2007
Contents
Location & Time
- When
- Tuesday, December 11th, 10:30 AM (EDT)
- Where
-
- Dial In - (888) 545-8370 , International: (770) 659-3936, passcode: 5107492128#
- WebEx - https://windriver.webex.com/meet/pawel.piech, number=563 254 332, password=ecl1pse
- Duration
- 1 hour
Attendees
Pawel, Ted, Francois, Marc, Veenu
Topics/Bugs to cover
- Test plan for M4.
- We have unit tests which are meant to be run every day.
- Manual tests in a test plan to be executed with every milestone
- Marc: have a dedicated test workspace to test with. Ted had a smiliar idea with a single workspace.
- Francois: Ericsson's contribution may be limited by program funding.
- CDT: No test plan.
- Veenu: maintaining a large test plan can become unmanagable.
- Pawel: there should be very little that's MI specific in the manual tests.
- Build issue: API change in Platform M4 as a result of fixing 202678. Moving to Platform M4 will also break CDT which DSF depends on (see also bug 202680).
- Wait till the platform milestone build. Week of January 1st.
- Registers
- Modules
- Do we need actions for loading and unloading symbols for libraries.
- Checked in code for modules detail pane.
- Expression view bug
- Marc to re-open the hierarchical expression bug for reconsideration.
- IDsfBreakpoint
Outstanding Action Items
- Pawel to look at CDT changes need to show global variables. bug 208921
- Marc to take ownership of the stack service.
Previous Meeting
DSDP/DD/DSF_Phone_27-November-2007
Next Meeting
DSDP/DD/DSF_Phone_11-December-2007