Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

DSDP/DD/DSF Phone 11-December-2007

< DSDP‎ | DD

Location & Time

When 
Tuesday, December 11th, 10:30 AM (EDT)
Where 
Duration
1 hour

Attendees

Pawel, Ted, Francois, Marc, Veenu

Topics/Bugs to cover

  • Test plan for M4.
    • We have unit tests which are meant to be run every day.
    • Manual tests in a test plan to be executed with every milestone
    • Marc: have a dedicated test workspace to test with. Ted had a smiliar idea with a single workspace.
    • Francois: Ericsson's contribution may be limited by program funding.
    • CDT: No test plan.
    • Veenu: maintaining a large test plan can become unmanagable.
    • Pawel: there should be very little that's MI specific in the manual tests.
  • Build issue: API change in Platform M4 as a result of fixing 202678. Moving to Platform M4 will also break CDT which DSF depends on (see also bug 202680).
    • Wait till the platform milestone build. Week of January 1st.
  • Registers
  • Modules
    • Do we need actions for loading and unloading symbols for libraries.
    • Checked in code for modules detail pane.
  • Expression view bug
    • Marc to re-open the hierarchical expression bug for reconsideration.
  • IDsfBreakpoint

Outstanding Action Items

  • Pawel to look at CDT changes need to show global variables. bug 208921
  • Marc to take ownership of the stack service.

Previous Meeting

DSDP/DD/DSF_Phone_27-November-2007

Next Meeting

DSDP/DD/DSF_Phone_11-December-2007

Back to the top