Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

COSMOS V1.0i12 candidate

COSMOS weekly status

QA status (Srinivas Reddy Doma)

RE/Build team status (Saurabh Dravid)

Web/Documentation (Rich Vasconi)

COSMOS Documentation Plan

Testing Status of COSMOS Candidate Driver COSMOS-1.0.0-200807241123

Team, after you have updated your status on this page, send an email to Jagmit Singh (jagmits at ca.ibm.com) so that he can track when all of the status is posted and ready. To reduce noise on the mailing list, report to cosmos-dev only if you find a problem that other people need to know about and react to. Jagmit will post an email stating when the driver has passed all tests.

Link to the candidate driver

Data Collection (Jimmy Mohsin)

  • cmdbf.services.tests = 100% pass

Data Visualization (Sheldon Lee-Loy)

Component Pass rate
org.eclipse.cosmos.examples.e2e.tests/DataVisualization.UI.Component.Widget 100%
org.eclipse.cosmos.examples.e2e.tests/DataVisualization.UI.Reports 100%

Resource Modeling (David Whiteman)

  • repository.tests = 98% pass
  • validation.tests = N/A
  • smlif.tests = 100% pass

build is good for RM

Management Enablement (Jason Losh)

  • manual MDR toolkit tests = 100%

Bugzilla status

Status to be filled in by:

  • Data Collection bugzilla status (Jimmy Mohsin)
  • Data Visualization bugzilla status (Sheldon Lee-Loy)
  • Resource Modeling bugzilla status (David Whiteman)
  • Management Enablement bugzilla status (Jason Losh)
  • RE/Build bugzilla status (Saurabh Dravid)
  • QA bugzilla status (Srinivas Reddy Doma)

The Status column can have one of these values:

  • COMPLETE
  • On track
  • At risk
  • Not containable
  • Not started

Enter the status on the i12 plan and status

Back to the top