Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Auto IWG F2F 2013 Oct
When:
28th Oct. 2013. Planned start: 10:00. Planned finish: 17:00
Where: Forum am Schlosspark Stuttgarter Straße 33, 71638 Ludwigsburg, Germany
Planned Participants:
- Harald Mackamul (BOSCH)
- Christoph Hammel (BOSCH)
- Christian Schenk (BOSCH)
- Karlheinz Topp (BOSCH) - afternoon session
- Ignacio Garro (Continental)
- Robert Kiss (Continental) - afternoon session
- Stephan Eberle (itemis)
- Klaus Birken (itemis)
- Maximiliam Kögel (Eclipse Source)
- Martin Hobelsberger (Timing Architects)
- Lars Geyer-Blaumeiser Lars (ETAS)
- Oscar Slotosch (Validas AG)
- Michael Drescher (Softing Automotive Electronics GmbH)
- Gereon Weiss (Fraunhofer Institute for Embedded Systems and Communication Technologies ESK)
- Benjamin Kamphausen (Fraunhofer Institute for Embedded Systems and Communication Technologies ESK)
- Mario Driussi (Das Virtuelle Fahrzeug)
Current planned Agenda:
- 10:00 Welcome and introduction
- 10:15 Track progress of the Working Packages Auto_IWG#Work_Packages
- Please WP owners be prepared with your updates
- WP1: Lars Geyer-Blaumeiser
- Document the update from 3.7 to 3.8.2 in the 3.x platform
- Prepare transfer of 4.2 to 4.3 for February (SR2 Kepler)
- Lars invites to WP1 meeting to refine the strategy for non "release train" plugins (e.g. ARTOP)
- WP2: Stephan Eberle: Status Sphinx
- Decission: Rename to "Modeling Platform" and extend scope to any support activities for modeling management (including workspace management)
- With Luna, Sphinx will be part of the release train
- There will be an ARTOP version for kepler with the release of kepler SR2
- New version of EMF Compare not yet integrated for Sphinx
- Sphinx will contain deliveries from WP6
- WP3: Ignacio Garro
- C refactoring features.
- Good improvements in the last versions. (>CDT 8.0)
- CDT 8.2 stays backwards compatible to eclipse 3.8.2
- Memory map extraction
- Conti shared requirements in eclipselabs. Bosch reviewed.
- Bosch provided proposal for global format. Conti review pending.
- Looking for partner in compiler development area.
- Current focus points Conti concerning CDT
- Continuous Integration
- Call of commands on a running workspace / workspace switch (see WP6).
- Tools / plug-in delivery. Versioning.
- Continuous Integration
- C refactoring features.
- WP5: Oscar Slotosch
- WP6: Christoph Hammel
- First contribution over eclipselabs is being prepared (Jan-Feb)
- Looking for partners and interesents for the project
- Will be part of sphinx in the future
- WP1: Lars Geyer-Blaumeiser
- Please WP owners be prepared with your updates
- 11:30 Tool-Qualification Roadmap. Oscar Slotosch (Validas)
- Tool qualification -> QPP File:EclipseRoadmap2103.pdf
- 12:00 EATOP. Stephan Eberle (itemis)
- EATOP is an eclipse framework for the development of EAST-ADL models
- EATOP uses the same sphinx basis as ARTOP
- EATOP will directly be moved to an eclipse project
- 12:30 Lunch break
- 13:30 Franca/Genivi. Klaus Birken (itemis)
- 14:00 Discussion about new possible activities.
- 14:30 Common Session with polarsys group
- ARCON
- CHESS
- AMALTHEA status update / AMALTHEA4Public overview (H. Mackamul, K. Topp)
- KITALPHA
- PAPYRUS
- POP
- Build Framework
- Tooling interfaces
NOTES:
- On the afternoon (14:30 - ) we will have a common session with the polarsys colleagues.
MINUTES: