Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Aperi Development Status Meeting 07/14/08

Aperi Wiki Home Aperi Meetings Aperi Development Meetings

Dial in numbers:

Toll Free: 877-421-0029 International: 770-615-1246 Passcode: 003399

Attendees:

IBM (Al Heitman, Chris King, Dave Wolfe, Michelle Lowe, Todd Singleton)

Minutes:

  • Project Leader Notes:
    • Installer Issue
      • Issues surfaced in June that Eclipse installers are not allowed to download non-approved 3rd party libraries. We are investigating this issue further and putting a remediation plan in place. There is a meeting with Bjorn scheduled for tomorrow.
      • Al submitted IPzilla Contribution Questionnaire for Apache Geronimo. Eclipse needs the source code for the jar file we want to include. Al is working on parsing down the source zip. It may take a while as there are about 2500 files in the jar Aperi is using.
      • DoJo not approved, should investigate alternatives perhaps look into replacements that are approved for other Eclipse projects.
    • 2008 planning (R0.5)
      • Still need milestones for Virtual Fabric / FC Security spec. from Brocade. Al sent a request to John for milestone details.
      • Still need milestones for Linux HA Cluster support from Novell. Robert indicated he could provide that in May. Al sent a request to Robert for any milestone details.
      • Al working on schedule update to incorporate Agile ideas from Dave and Todd into the plan. Al set up a meeting with them to flush this out further. Legal approval process may complicate this Agile methods.
      • Al needs to work with Dave on pedigree review of LIC XML spec.
    • Aperi Committers:
      • The following committers still need the legal “paperwork” completed before full committer access is granted.
        • John Crandall
        • Jenny Monesson
  • Release Engineer Notes (Todd):
    • Build status/process
      • Al will look at the build logs for the 3rd party compile problem.
    • Build status/process
  • Aperi Downloads:
    • June totals are 167 total, with 65 for SAN Simulator and 102 for SRM. Al will update the downloads charts later today.
    • Aperi reached the 3000th download in June!
    • Latest stats
    • Aperi webinar
  • Development items/issues:
    • SSO – Todd is writing a browser based sample client along with the documentation for the SSO client which will be used as a starting point for the LIC sample application unit test framework. Todd ran into some problems reproducing the SSO environment. The schedule deadline is at risk. Todd’s sample app is 100% complete and this problem is on the server side.
    • LIC – Dave is working on the specs for LIC. We need to find a standard to get LIC XML schema definition. At the last meeting, Russ suggested this would be good for Martine to look into.
    • SAN Simulator - The code is checked into CVS. Todd completed the build. We need to get committer community to do a code review before we release it. Al will initiate committer code review soon. Ramani is writing the IDVT test plan. Al sent a note to Ramani to get the latest status.
    • Java Help – Chris/Todd This activity is scheduled to start in the next few weeks.
    • Virtual Fabric / FC Security spec – need update from John.
    • Linux HA cluster support – need update from Robert.
  • IDVT:
  • ID:
    • Chris is working on the ID plan. He put a version out on wiki will start a review at the end of the week.
  • Project Schedule:
  • Action Items:
Item Owner Target Status
Obtain two mentors Al 06/27/08 Per new development process rules, we need to obtain two project mentors. Harm Sluiman is one. Discussed with Tom last week. Bjorn has a list of mentors we can use. Al to follow up with Bjorn.
Document Control Al 05/29/08 Write up text for Aperi document control. Al will write up a process to get documents reviewed and approved.

Back to the top