Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Aperi Development Status Meeting 02/12/07

Aperi Wiki Home Aperi Meetings Aperi Development Meetings

Attendees:

IBM (Brenda Haynes, Craig Laverone, Chris King, Christoph Reichert, Dave Wolfe, Hans Lin, Khan Tasinga, Rodica Ciurea, Simona Constantin, Ted Slupesky, Tom Guinane), LSI (Jenny Monesson)

Minutes:

  • Project Leader Notes (Ted)
    • Updated Aperi download to get SNIA HBA API binary automatically. Only manual steps left are the Sun code.
  • Release Engineer Notes (Todd)
  • Aperi Downloads
    • Latest stats
    • After the spike in last weeks download stats, it appears there may be a defect in the Eclipse download statistics program. Tom opened Bugzilla 173144 to address.
  • Project Schedule:
    • Latest Schedule Updates made in the file.
    • John T. to distill an early paper he wrote for Aperi into a draft set of use cases that the community can review. Ted will get the target date from John for these.
  • IDVT
    • Test Status
    • Problems with the GUI build – Rodica will address for tomorrows build.
    • We need to move to an integrated build and integrated install. Todds work on the PDE build will address this.
  • ID
  • Action Items
]-
Item Owner Target Status
Third Party Dependency Questionnaire Tom ongoing Questionnaires submitted 9/6. - Utilizing the IP Log to track the individual IPZilla entries for each Third Party Contribution Questionnaire.
  • Other:
    • Eclipse Con., Santa Clara, March 5-8 2007, Remaining KEY DATES:
      • February 14th - Early registration deadline
        • Ted and Todd have signed up
      • March 1st - Late registration deadline
    • Next Meeting will be February 19
  • Open Forum

Back to the top